A 750 bedded teaching hospital with medical college a nursing college their hostels and residential quarters for faculty and staff were designed. Particularly challenging for this project was to incorporate changes made in the requirements for Operation theater wing for teaching hospital as these changes in rules came after the first phase of teaching hospital was complete and there was very limited space left to comply to the new requirements. The entire project was also too be completed in a specific time period so as to match the fresh admission intake for medical college.